REIL, Jaipur invited Tender for 100 MW Automatic Solar Module Manufacturing Line

Rajasthan Electronics & Instruments Limited invites sealed bids (Technical & Financial) from eligible bidders valid for a minimum period of 90 days from the date of opening of the bid for “Setting up of 100 MW Automatic Solar Photovoltaic (SPV) Module Manufacturing Line (On Turnkey Basis)”.

The time line for Completion of the installation & Commissioning of line is 7 months from the date of issue of Purchase Order.

Warranty: The supplier should give comprehensive Guarantee/ Warranty for a period of 24 months of overall line from the successful installation & commissioning of the line. During this period supplier /manufacturer should replace/ repair the defective parts and consumables. The entire expenditure including freight, customs duty, customs clearing charges, GST and local transportation if any for such replacement shall be borne by the supplier. In order to unintrupted operation of line, during warranty period , a set of spare parts & consumables for over all line shall be provided by supplier. Supplier will also undertake for after sales support for supplied item for the next 5 years after completion of warranty period on Chargeable basis. Supplier will provide the list of Spare parts and consumables with tentatives price before completion of the warranty period of line.

EMD – Rs 36,30,000.00

Document Fee: Rs 2,500

Last date & Time for Online Submission of bids : 26th September 2022