UREDA invites bids for empanelment of the EPC for Off-grid Solar Power Plants (with Battery) at various locations in the State of Uttarakhand

UREDA invites bids for empanelment of the EPC Contractors for “Design, manufacture, supply, erection, testing and commissioning of Off-grid Solar Power Plants (With Battery Bank) including warranty & maintenance for 5 years at various locations in the State of Uttarakhand”.

UREDA will empanel various firms who participate in this empanelment process and wish to provide their services on the lowest quoted prices which are received under this offer. The selected firms will have to install the Off-grid Solar PV Power Plants in accordance with technical specification and various other requirements as per latest directions/guidelines of MNRE under JNNSM.

Work orders shall be placed by UREDA to various empanelled firms and they will design, manufacture, supply, erect, test and commission the Solar Power Plant and shall make all necessary arrangements for satisfactory maintenance and performance of the Power Plant. Warrantee and Maintenance period will include rectification/replacement of all the defective and consumable components/items including batteries.

It is important to note that under “Off-grid Solar Power Plants (With Battery Bank)”, various projects ranging between 1 KWp to 25 KWp capacities shall be allotted. The work shall include “Design, manufacture, supply, erection, testing and commissioning of Off-grid Solar Power Plants (With Battery Bank) including warranty & maintenance for 5 years at various locations in the State of Uttarakhand.

The project installation may differ from site to site. The following types of sites may be considered:
Flat Roof Top
Inclined Roof Top
Open Flat Land
Open hilly and inclined land, etc
Further as the plants may be situated in plain areas as well as remote hilly areas without roads in the State; the various requirements for installation of plants may vary according to the location of the plant. The bidder should consider the various factors related to transportation and mounting structures for solar modules with respect to different size/location and type of roof of Solar Power Plants.

Further additional separate electric cable/wiring etc shall be required to energize the proposed load according to the requirement of the beneficiary and arrangements for storage of batteries of Solar PV Power Plants such as appropriate cabinets/ battery room shall have to be done.

These factors should be taken into account by the bidder before providing his rates for the execution of the work.

  • Experience of minimum 300 KWp Off grid solar power plant projects installed at Government buildings in last two years shall be mandatory. Certificate of experience from SNA/DISCOM/PSU/Govt. Department regarding installation & commissioning of Off-grid Solar PV Power Project (With Battery Bank) shall have to be enclosed and should clearly indicate the Off Grid Solar Power Plant (With Battery Bank).
  • Enclose details with contact number of 5 Nos of sales and service centers established in Uttarakhand.

EMD Amount in ₹: Rs 10,00,000.00

Tender Fee in ₹: Rs 7080.00

Bid Submission End Date: 06-Nov-2019 05:00 PM